PHIVOLCS
 
Foreword
The July 16 1990 Luzon Earthquake Rupture
Inventory and Characterization of Landslides induced by the 16 July 1990 Luzon Earthquake
Mapping of Areas Affected by Liquefaction during the 16 July 1990 Earthquake
The 16 July 1990 Luzon Earthquake and its Aftershock Activity
Soil Study of Area Damage due to Liquefaction during the 16 July 1990 Philippine Earthquake
Vital Engineering Lessons from the Earthquake of July 16, 1990
Quantifying Spatial and Temporal Dimensions of Premonitory Animal Behavior of the July 16, 1990 Luzon Earthquake
Households and Communities in a Post-Earthquake Situation: Lessons on Survival and Self-Reliance
Organizational Response to the July 1990 Luzon Earthquake Disaster
Psychosocial Issues in Disasters
Management Strategies for Earthquake-Related Psychosocial Problems Community-Based Interventions
Some Implications of the July 16, 1990 Earthquake on Urban and Regional Planning in the Philippines

 

 

 

 

 

 
ORGANIZATIONAL RESPONSE TO THE JULY 1990 LUZON EARTHQUAKE DISASTER
Jean C. Tayag and Sheila I. Insauriga
Philippine Institute of Volcanology and Seismology

 

INTRODUCTION

The strongest and most destructive earthquake to hit the Philippines in the last two decades struck on 16 July ,1990 with a magnitude of 7.8 on the Richter scale and a maximum felt intensity of VIII in the Modified Rossi-Forel (MRF) scale (VIII- IX in the Modified Mercalli scale). The epicenter of the event was located at near the town of Rizal? Nueva Ecija, at a depth of 28 km. This major earthquake and its attendant geologic processes--surface faulting, liquefaction, landslides and debris flows-- exacted a toll of 1283 dead, 2786 injured, 321 missing (NDCC, Nov. 14, 1990) and more than P18.7 Billion in actual damages to public infrastructure and facilities and private properties (NEDA, Nov. 1990). Four regions in north and central Luzon suffered the heavy damage and casualties with the cities of Baguio, Dagupan, Cabanatuan and San Jose bearing the brunt of the disaster.

In the first days and weeks after the disastrous event, governmental and non-governmental organizations or institutions were hard-pressed in undertaking tasks brought about by the disaster-the rescue and recovery of trapped or isolated victims; the provision of food, clothing, medical attention, and temporary shelter to the displaced; and repair and restoration of function of power, water and other utility systems, transportation and communication.

A report of the United Nations Disaster Relief Office (UNDR0, 1986) pointed out a number of myths about or popular images of organizational response in emergencies which have been found to be often incorrect, leading to negative consequences or administrative difficulties in meeiing disaster needs and managing relief and recovery operations. Among the popular assumptions is the myth of overwhelming impact on local leadership- according to which local organizations in a disaster area are overwhelmed, rendered ineffective, lacking both leadership and personnel. Logical moves based on these assumptions are: 1) the imposition of strong centralized leadership by some unaffected outside person to cope with the confusion; and 2) direct distribution of relief and assistance from donors to recipients, resulting in inappropriate relief, superfluous volunteers and duplication of efforts.

How applicable were these popular images of organizational response in the areas hit by the 1990 earthquake? Were the local organizations overwhelmed and incapacitated? How did the local disaster concerned organizations particularly the DCCs measure up to the tasks of coping with the disaster? How did the national government and private and nongovernmental organizations (NGOs) respond?

The aim of the study was to assess the response of organizations and institutions to the July 1990 earthquake disaster in Luzon, from at least three viewpoints-- those of the media, the government disaster management officials and the affected inhabitants. It was hoped that in the process, the lessons imparted by the experience could be underscored and alternative solutions explored.